Friday, October 31, 2008

October update

I know we have been slacking on the updates but here is what has been done for the month.

Siding: The whole house will be finished tomorrow. We have on section of the lower garage to do. Then some more caulking.

Soffits: They are completely done. Dad has been running all the scrap down to the recycling center in Hugo.

Heating: The furnace is up and running. We had a small snafu when the heating guy cross two wires in the thermostat but that has been fixed. He is now working on the in-floor heat and getting it piped into the boiler so that can be turned on before it gets too cold.

Power: The off-peak meter should be installed today.

I know Rachel has some pictures but I don't have them with me. I'll load those as soon as I get them.