I was able to start getting some of the metal drip edge up along to roof. It was a slow process since I had to keep moving the ladder every 4 nails but I did get a lot up. Jeremy showed up later on Saturday and helped me run to Menards to pick up the bath tub for the girls bathroom and the shower for mine.
Last weekend Doug and I were able to get both Lydia and Ava's bedrooms and bathroom framed up. The picture above is looking at the girls' bathroom and Ava's bedroom(to the left).
The above picture is standing in my bedroom looking toward the laundry room. The three squares at the bottom of the picture are Rachel and my walk in closets. The hallway to the master bath is the middle square. Just above those is the master bath. The 2 X 6 that is on the floor in front of the propane tank separates the master bath and the laundry room.