Tomorrow (8/19/2008) we have our electrical inspection scheduled. After walking through the house everyday I am hoping that everything will go as planned and I will be able to call for a framing inspection.
Below is all the water lines for the house. This past weekend we got the well running, a pressure tank installed for the well and the hot water heater. We will be looking at water softeners in the next few days.
No comments:
Post a Comment