Monday, December 31, 2007

Roof is coming along

Well we spent all of Saturday putting up the roof trusses. We had 5 of us there getting the trusses up. It was a little tricky because we had to lift the trusses up to the second floor then get them up on the walls.



Then on Sunday Doug and I spent the day putting up the hip trusses of the garage side of the roof, finishing up some corners and figuring out how to get the valleys framed in. In the next day or so we should be getting the overhang framed above the bedroom(left side on the pic below) and getting the eves trimmed back so we can set the 2 X 6. and who knows we may even get some of the plywood up!

Monday, December 10, 2007

If only the weather would cooperate

Well the snow is here to stay and I ended up investing in some Lacrosse insulated work boots. Sunday the 10th we were able to get started on the roof trusses. We got up the main supporting truss for the north side and the hips.


During the week last week there were quite a bit of walls going up on the first floor. Above you can see the entry closet and the study wall along the staircase.


I was able to finish up the pantry walls this week. Next set of walls to go up will be the bathroom and the other wall along the staircase.


Here is the wood that is left for the garage, the sheeting for the roof, and the remaining roof trusses to be put up. We are going to see if a few people are able to get the trusses upstairs but if cannot we'll get the marks on the top plate and hire a crane to come out and lift the few we can't do by hand.

Friday, November 30, 2007

Second floor just about there

Looking at the above picture (second floor), the window in front on the left is a bedroom then to the right is a bathroom. The last two on the left are another bedroom.


We got the second floor outside walls up except for the garage wall since we don't have the staircase built yet.

This is a view from the living room on the first floor. On the right with the big window is the dining room. Behind the dining room wall will be a bathroom and a place for the girls to hang their coats and stuff. To the left in front of the wall will be the kitchen. Behind the wall will be a storage area for an upright freezer and a pantry.


This is looking from the kitchen. To the right is the living room. To the left of the post is the staircase going upstairs.




Here your are seeing where the staircase will be going upstairs. To the left will be closet and office. Obviously to the left of that is the front door.

This weekend is going to be hectic since they are predicting 6" - 12" of snow. We'll see how accurate they are.

Monday, November 19, 2007

Finally out of the Basement

Now that the floor on the main floor is decked we were able to get the walls up. We did this on the 10th and the 11th.
Luckily we had the help because we built the walls on the ground then put the sheeting and Tyvek on and lifted them into place. Now I don't have to get on a ladder to put the sheeting on.



View of the back from the lake. Remember we still have on more floor to go.


This weekend (17th and 18th) we got the main beam on the main floor up and all the floor joists. Next step, putting the floor sheeting down. Hopefully we will have the walls up after Thanksgiving.

Friday, November 9, 2007

One more step

One more step was completed by getting the decking on the first floor. Now it's time to lay out the walls and waterproof the prestressed concrete so we can pour the top coat.

Thursday, November 8, 2007

Progress!

I got a call on the 5th informing me that Molin had me on their schedule to install my garage floor and front porch. So I decided to take the day off and watch.



It ended up being a very nice and productive day. Doug, Dad and I were able to finish getting the rim joist up for the stairs, set the floor trusses and got about half of the floor sheeted. We are well on our way to getting walls up this afternoon.


Tuesday, October 30, 2007

Bassement floors are now poured!

On Saturday we were able to get our floor poured. Normally we would have framed the house first but if we did that there wouldn't have been an easy way to pour the floor. This way we were able to get the pump truck out one last time.






I worked Wednesday and Thursday night getting the tubing in for the in-floor heat installed and on Thursday we had an inspection of the floor, roughed in plumbing in the basement and the waterproofing on the foundation. Unfortunately the waterproofing did not get signed off on because the inspector was not familiar with the product. Since then I have been able to talk to the inspectors and get everything straightened out so Perry Excavating will be out on Thursday and possibly Friday.



Halloween is a big day for the Hansen's! Not only are the girls excited to go out trick-or-treating but we get our first load of wood delivered. We should be receiving the wood for the basement, the first floor joists and the first floor framing. Now our progress should go fast (hopefully).



That's all for now next time I should have pictures of the backfilling and the load of wood.